Project Case Studies

Real-world applications of our engineering expertise, demonstrating rapid deployment, reliability, and continuous support during critical times.

CASE STUDY 1

EURO GLOBAL CYLINDERS LLP

Recent LPG Crisis (March 2026)

Challenge

Customer was using LPG / Propane Bulk Tanker. During the LPG Crisis they requested a continuous LPG supply solution to avoid production shutdown.

Solution

Suggested installation of LPG Manifold System using 425 KG LPG Cylinders. Customer placed the order in 2 days. Installed 6 Working Cylinders and 6 Standby Cylinders. Installation completed within 24 Hours. Started continuous LPG Filled Cylinder Supply immediately.

Result

Customer remained fully operational. Not a single day of production shutdown.

Project Gallery

Project Image
Project Image
Project Image
CASE STUDY 2

EVEREST KANTO CYLINDERS LIMITED

KA SEZ Zone, Gandhidham, Gujarat Recent LPG Crisis (April 2026)

Challenge

Bulk LPG supply interruption.

Solution

Installed 10 Working & 10 Standby 425 KG LPG Cylinder Manifold System. Installation completed within 3 Days. Continuous LPG Filled Cylinder Supply started immediately.

Result

Customer remained operational. No production shutdown.

Project Gallery

Project Image
Project Image
CASE STUDY 3

EVEREST KANTO CYLINDERS LIMITED

Ratadiya Unit, Mundra Highway, Gujarat Recent LPG Crisis (April 2026)

Challenge

Bulk LPG interruption.

Solution

Installed 10 Working & 10 Standby 425 KG LPG Cylinder Manifold System. Installation completed within 3 Days. Continuous LPG Cylinder Supply.

Result

Customer never stopped production.

Project Gallery

Project Image
Project Image
CASE STUDY 4

GOPAL SNACKS LIMITED

Project 1: Gondal Rajkot Unit

Customer had no PCC flooring. Client completed PCC flooring within 1–2 hours. Immediately after drying our team installed 500 KG/Hour Water Bath Vaporizer and 4 + 4 LPG Cylinder System within 24 hours.

Project 2: Modasa Unit

Order received before Dhanteras (Date: 13 October 2025). Production had to start on Dhanteras Muhurat. Installed 1000 KG/Hour Water Bath Vaporizer, 500 KG/Hour Water Bath Vaporizer, and 8 + 8 LPG Manifold System. Entire installation completed within 2 Days.

Project 3: Chapra Unit

Same installation setup as Modasa Unit.